A sample project showing how the construction updates work. (Sample — replace with a real project or hide it in the admin)
Construction timeline
Real photos from site, newest first · 5 updates
-
2 October 202680%
Roofing and window frames
Steel roof structure installed and roofing completed; ground-floor window frames are going in, with alignment and levels checked by the engineer.
-
15 September 202660%
Walls and plastering
Walls on both floors completed with stiffener columns and lintels as drawn; exterior plastering has started.
-
20 August 202640%
Columns, beams and second floor
Columns, beams and the second-floor slab poured; the engineer inspected the reinforcement with our team before each pour.
-
25 July 202620%
Foundations and ground beams
Piling, foundations and ground beams poured; levels and column alignment checked against the drawings.
-
10 July 20265%
Construction starts
Site preparation and building layout according to the design approved by the owner (rendering of this house).